Monday, March 25, 2024

Updated Legal Advisory/Notice No. 2024 - 0303 Updating the June 10, 2023 Notice : Royal Family's Land Inventory Project #2- Abner Paki RP300 LCA121 0.75 Ac. Notice of Non-Receipt of Rents & Service of Eviction sent from Amelia Gora - a Royal Person, Representative of our Royal Family - Kalola the next-of-kin to Bernice Pauahi Bishop heir of Abner Paki, et. als.

 Posted again today, March 25, 2025:

GmailAmy Gora <goraamy69@gmail.com>

Royal Family's Land Inventory Project #2- Abner Paki RP300 LCA121 0.75 Ac. Notice of Non-Receipt of Rents & Service of Eviction sent from Amelia Gora - a Royal Person, Representative of our Royal Family - Kalola the next-of-kin to Bernice Pauahi Bishop heir of Abner Paki, et. als.

Amy Gora <goraamy69@gmail.com>Sat, Jun 10, 2023 at 12:07 PM
To: info@ywcaoahu.org

 

Inventory Project #2 Abner Paki - Oahu - Richards Street RP300 LCA121 0.75 Ac.

 Inventory Project #2 for Abner Paki's Private Property - Richards Street  RP300  LCA121  0.75 Ac.

  


To:  


Kamehameha Dynasty 

Royal Family Notice No. 2023-0610
Updated:  2024 - 0304


Greetings,

Rents are past due for Abner Paki's - Richard Street Land.Updated  Amount:  $500,000 per month retroactive to 1924.  The YWCA - on Richards Street Failed to pay rents to our Royal Family. 

The lands of Abner Paki are our Royal Family's Allodial lands and documented on our Land Inventory.

 Kindly vacate our Private Properties.  
 
You have purchased our lands from non Allodial landowners.

This is our Royal Family's Private Properties as documented on our Land inventory.  

You also contacted the Police Department who were unaware of our Royal Family's land ownership in the Hawaiian Islands and filed a report, a false report due to the fact that you are Not the true landowners.

Because you have purchased from non-owners, you will need to obtain your monies back from those who sold you our lands.

We will be utilizing this property/ land for our offices, etc.  

We are the true landowners with Allodial land titles.  We have the same bloodlines as Abner Paki - his daughter Bernice Pauahi Bishop, Ruth Keelikolani, Kalola, et.als.

Billings for rents were sent and due to no response, this also serves as an Eviction Notice Effective immediately - June 10, 2023.

Note:  We can move onto our property(ies) at our pleasure.

Mahalo,

Amelia Gora, a Royal Person, One of our Royal Family's Representatives, etc.

References:


Neutral Nation to Neutral Nations/Nations Legal Advisory/Notice No. 2023-0522 Facts About Charles Reed Bishop Affecting All Lands in Hawaii from Amelia Gora, a Royal Person, Representative, Acting Liaison of Foreign Affairs, House of Nobles, Judicial Tribunal Judge, etc. - Kingdom of Hawaii

    

 

  

 


 

 

 
Neutral Nations/Other Nations
U.S. President Joe Biden
U.S. Secretary of State 
Governor Josh Green
 
Many Others
     

   Neutral Nation to Neutral Nations/Nations Legal Advisory/Notice No. 2023-0522 Facts About Charles Reed Bishop Affecting All Lands in Hawaii from Amelia Gora, a Royal Person, Representative, Acting Liaison of Foreign Affairs, House of Nobles, Judicial Tribunal Judge,  etc. - Kingdom of Hawaii 

 
 

Greetings,

 

The following information shown below is evidence showing fraud, piracy, pillaging, racketeering, conspiracy(ies), deceit, thievery by non owners claiming to be the landowners in the Hawaiian Islands since 1893.

In our Inventory project reviewing lands of our Royal Family, much fraud has been uncovered.

A team of our Royal Family members or konohiki/caretakers have written emails/letters, visited various locations and have confronted hostile including weapon carrying individuals/including police persons called by individuals  who have failed to prove documents of ownership, nor are they related to our Royal Family members.

Examples:  The KSBE/Bernice Pauahi Bishop Estates, The Aquarium, Bishop Museum, Women's YWCA, Washington Place, Boy Scouts - in Nuuanu, Hawaiian Electric Co. - Downtown, the Queen's Hospital, Heeia Ahupuaa, Punaluu Ahupuaa, Bank of Hawaii, First Hawaiian Bank, Kapalama Shopping Center, Queen Liliuokalani Children's Center, Iolani Palace, Moanalua Ahupuaa, Moses Kekuaiwa's Ahupuaa, Waimanalo Ahupuaa, Pohakuloa Ahupuaa, Waikoloa Ahupuaa, the State of Hawaii Attorney General, etc.

According to our Kingdom of Hawaii laws, no one can take our lands away; we can move on our lands at our pleasure.

According to the Doctrine of Political Question, we are part of the Kingdom of Hawaii, and have a separation of powers as documented by  former U.S. Senator Daniel Inouye.

According to University of Hawaii Law Professor Williamson Chang, there was no Annexation.

According to United Nations Dr. Alfred deZayas, we have international immunities.

As a Royal person, a Royal Family member as a Kamehameha descendant from four (4) of his children, two (2) of his hanai/adopted children, and four (4) of his stepchildren, we have immunities.

As the Acting Liaison of Foreign Affairs, we have immunities and those subjects who are with us also have immunities.

We maintain a Constitutional Monarchy government,  remain a neutral, friendly, non-violent nation and aware that the permanent friendship and amity Treaty of 1850 continues on.

Breach of Neutrality law of 1854 is documented.

U.S. President Grover Cleveland gave Hawaii back to Queen Liliuokalani in 1893, 1894, and 1897.

Additional Evidence

The following evidence shows that the Trustees of the Kamehameha Schools/Bernice Pauahi Bishop Estates/KSBE are Not the land owners of our Allodial lands.

According to research, the facts found are as follows:

(1)  The Estate of Bernice Pauahi Bishop ended in 1893 because it was an estate created in 1884 and belongs to the Kingdom of Hawaii.

(2)  Bernice Pauahi Bishop's husband Charles Reed Bishop was a party to those who usurped Queen Liliuokalani in 1893, was a documented conspirator, a treasonous person who lost all interest in our Royal Family's lands.

(3)  Charles Reed Bishop was entitled to only 1/2 of the Estate of Bernice Pauahi Bishop for his life time only.

Note:  Kalola a stepsister, and cousin of Bernice Pauahi Bishop was her next-of-kin and owned 1/2 of the Estate until the death of Charles Reed Bishop, then she would own the full estate.

(4) Charles Reed Bishop deeded his life interest to himself and the Trustees of Bernice Pauahi Bishop.  The Trust was null and void because conspirators became a conspirator, treasonous group who moved to pirate lands, assets, and resources, etc.

(5)  Charles Reed Bishop and Trustees reformed the Trust in 1896 which made the Trust null and void.

(6)  Charles Reed Bishop died.  His life interest ended.  The Trustees interests ended.

Instead, the Trustees made themselves heirs and perpetuated crimes against the true Allodial landowners, the next-of-kin Kalola's descendants and heirs.

(7)  Aliens are squatting on our Private Properties.  The Aliens are not able to prove their Allodial land titles.  

(8)  Rents of $500,000 per acre per month retroactive to 1893 are the amounts charged by our Royal Family.

The following post is recorded for the legal records and as a notice conveyed that failure to pay rents is cause for the removal of the parties and recorded eviction notice.

The buildings on our Royal Family's properties may remain or will be removed by the squatters with costs to the squatters.

This is a general message served to many and applicable to those on our Private Properties:

Monday, May 22, 2023

The Legitimate Government in Hawaii Series: FACTS ABOUT Charles Reed Bishop Affecting All Lands in Hawaii

 The Legitimate Government in Hawaii Series:  FACTS ABOUT Charles Reed Bishop Affecting All Lands in Hawaii

                                                                           Reviewed by Amelia Gora (2023)


Most people don't know the Truth About the Kamehameha Schools Bishop Estates/ Trust of Bernice Pauahi Bishop and her White Supremacist Husband Charles Reed Bishop.

Charles Reed Bishop and Trustees played a part in dethroning Queen Liliuokalani in 1893, and importantly he had only a Life Interest in his wife Bernice Pauahi Bishop's Estate.

He became part of an Alien Nation that had No Sovereignty called the Provisional Government, turned Republic then made a Territory of the United States turned Territory of Hawaii by a President who failed to follow the Rule of Law named U.S. President William McKinley.


See:  https://amelia-gora.blogspot.com/2017/12/american-civil-war-losers-and-their.html


Charles Reed Bishop had only a Life Interest in the Estate of Bernice Pauahi Bishop as evidenced by the Deed below which was found at the Bureau of Conveyances, Liber 142 pages 142-143 in the Kalanimoku Building, Downtown Honolulu, Oahu, Hawaii.

See:  





Life interest ends upon one's death.  A transfer of a life interest does not extend time to the person or others who have no legal rights to Royal Family lands.  These documents are evidence of a conspiracy by Aliens who moved to defraud the true heirs and supported by bankrupt nations - the U.S., Great Britain, and France who had invested in the American Civil War and were bankrupt since 1865.

The three (3) nations had a protectorate over the Kingdom of Hawaii until 1893 then placed a protectorate over the Alien entity called the Provisional Government.

The three (3) nations also breached the Neutrality Law of 1854, and the Treaties.

 

TIMELINE


1884 - Bernice Pauahi Bishop died of breast cancer.  She was the next- of kin to Ruth Keelikolani who died in 1883 and inherited 353,000+ acres of land, a Palace, artifacts, etc.

Her total lands amounted to 400,000+ acres  of land, a Palace, artifacts, etc.

Reference:  

http://sunnycv.com/steve/ar/17/article-hawaii1.html

Bernice Pauahi Bishop's husband inherited 1/2 of her estate for life - a life interest.

Bernice Pauahi Bishop's next-of-kin was Kalola, a stepsister and cousin who was also a Kamehameha descendant.

Kalola inherited 1/2 of her estate and the full estate after the death of Charles Reed Bishop.

1886 - Kalola died and her descendants/heirs lived on.

Her heirs were Kahananui, widow of her son Kahekili/Alapai Kahekili Luluhiwalani who had a son named Ioela.

Kalola and her husband Luluhiwalani/S. Luluhiwalani had a hanai/adopted daughter named Kapooloku/Kapoolohu/Abigaila/Poomaikelani/Princess Poomaikelani.

Ioela married Kapooloku/Kapoolohu/Abigaila/Poomaikelani/Princess Poomaikelani had Haili who married Kaluakini and had Elikapeka and others.

1893 - Charles Reed Bishop conspired against Queen Liliuokalani and helped to dethrone her.  Bishop lost all interest in the Estate of Bernice Pauahi Bishop.

Bishop became part of an Alien entity called the Provisional Government which had no Sovereignty.

Meanwhile, the Kingdom of Hawaii with full Sovereignty continued on.

 Charles Reed Bishop carried on as if he did not lose all interest in lands in the Kingdom of Hawaii.

Charles Reed Bishop transferred his life interest to himself, and the Trustees of Bernice Pauahi Bishop Estates. 


1896 - Charles Reed Bishop  sold Princess Ruth Keelikolani's Palace to the Provisional Government turned Republic of Hawaii which had no Sovereignty.

Bishop did not own the full interest in Princess Ruth Keelikolani's Palace because he had inherited only 1/2 interest for his life only.

Kalola's descendants/heirs were also heirs with 1/2 interest and a full interest since 1893.

Note:  Charles Reed Bishop died in 1915.

 

Charles Reed Bishop became Part of the Provisional Government, turned Republic etc. Affected the Ownership of the Estate of Bernice Pauahi Bishop, lands in Waikiki, the Aquarium, the Bishop Museum, etc.

The Reformation of the Kingdom of Hawaii Trust was made by a foreign, Alien entity assuming Private Properties of our Royal Family from a 100% Sovereign Government

 The Hawaiian star. [volume] (Honolulu [Oahu]) 1893-1912, July 28, 1896, Image 1

Image provided by University of Hawaii at Manoa; Honolulu, HI

Persistent link: https://chroniclingamerica.loc.gov/lccn/sn82015415/1896-07-28/ed-1/...

 

Charles Reed Bishop left the islands to work with the J.P. Morgan bankers and ran with the monies, investments, etc.

Bishop's interest in his wife's estate legally ended on January 17, 1893 when he participated in a concerted effort to usurp Queen Liliuokalani.

The premeditated, planned invasion of Hawaii succeeded due to Charles Reed Bishop, the "backbone" of the usurpation of Queen Liliuokalani and the Pirate who obtained properties, monies, artifacts, gold, etc. under false pretenses.

His life interest ended and all of the interest in the Estate of Bernice Pauahi Bishop was fully owned by Kalola descendants and heirs.

1915 - Charles Reed Bishop died.  His life interest in the Estate of Bernice Pauahi Bishop ended upon his death.

The Trustees of Bernice Pauahi Bishop's interest transferred by Charles Reed Bishop also died.

The Trustees of Bernice Pauahi Bishop perpetuated fraud, deceit, piracy, plundering, racketeering, etc. and continued on with criminal claims.

1959 - U.S. President Dwight D. Eisenhower through his Executive Order made Hawaii a State of the U.S. with a shared 1/50% interest in Sovereignty.

1986 - 1996 Evidence of criminal activity by the Trustees, et.als. of the Estate of Bernice Pauahi Bishop Estates recorded by Whistleblower Greg Wongham (dec.) shown at the link:  https://iolani-theroyal.blogspot.com/2023/05/the-legitimate-government-in-hawaii_0.html

1996 - An Affidavit/Lien No. 96-177455 (281 pages) was filed which is a lien on all 132 islands (133 includes Loihi) at the Bureau of Conveyances, Honolulu, Oahu, Hawaii by Amelia Gora.  Genealogies, History, Premeditation evidence, etc. included.

2000 - There was no Annexation meaning there's no U.S. Jurisdiction in the Hawaiian Islands.



2015 - Annexation of Hawaii is a Myth documented by University of Hawaii Law Professor Williamson Chang documented.

2018 -  The U.S. is an occupier as documented by United Nations Dr. Alfred deZayas.

2019 - Joinder No. Doc A-71510779 filed on July 31, 2019 (118 pages) filed - a Joinder to Afft. Lien No. 96-177455 filed on 12/17/96 (281 pages) with genealogies showing descendants of Kalola exists, Kalola is documented as the next-of-kin to Bernice Pauahi Bishop filed by  Francis Gora, John Gora, and Amelia Gora - descendants and heirs of Kalola and Representatives of our Royal Family.

2023 - Inventory of Ruth Keelikolani's, Bernice Pauahi Bishop, Kalola's lands, etc. continues.

Genocide Activists recorded for the Legal Records of the Kingdom of Hawaii while visiting our various lands recording squatters, etc.

Research incomplete.


aloha.




Reference:

by WBC Chang2015Cited by 30 — Chang, Williamson B.C.. Darkness over Hawaii: The Annexation Myth Is the Greatest Obstacle to Progress ...
by D over HawaiiCited by 30 — The Annexation Myth Is the Greatest Obstacle to. Progress. Williamson Chang*. I. INTRODUCTION: THE MYTH THAT HAWAI'I WAS ANNEXED BY THE. UNITED STATES…
Because the annexation was illegal, he and others seem to argue, statehood must be void, and the State of Hawaii does not hold legal title to Hawaiian land.
10 pages
Text of the Hawaiian Annexation Treaties of 1854, ... Beet sugar, annexation not injurious ... The following table shows the change wrought since the.
Profile image of Williamson Chang ... Download Free PDF ... The century-long occupation and illegal annexation of Hawaii could not become public in 1953.
Feb 8, 2022 — Without permission from the U.S. State Department, Minister Stevens recognized the new government and proclaimed Hawaii a U.S. protectorate.
May 10, 2019 — Expert to Hawai`i Judges: Islands Under “Strange Form of Occupation” by U.S. DeZayas addressed this letter to Hawaii Circuit Court Judges Gary ...

Jan 27, 2013 — Just found out that Greg Wongham Was MURDERED! sorry no details - only from a credible person All Kanaka Maoli, Whistleblowers/Friends of ...
Myron Isherwood of the. Department of Agriculture testified in support of the project. He said the area was abandoned because the lease expired. Isherwood said ...
After his honorable discharge lie returned to the Army National Bank as assistant casluer. When that institution was merged with the Bank of. Bishop & Co., Ltd.
Sep 19, 2020 — Greg was definitely onto something with the Chinese and Donna Tanoue. Tanoue sat on a board with Gary James Baldwin probably one of the late 

*****************************************************************************************










                                       Kingdom of Hawaii Collection Agency
                
                                    - Royal Family's Land Inventory Project -
                                                       Abner Paki

Island of ___Oahu - Richards Street_____________________________________


Date: __________June 1, 2023_______________________________________


Name: __________Abner Paki _______________________
Royal Patent Number _______300______________________________

Land Commission Award Number _______121______________________
(for Royal Patent only)


Grant No.________________________________________________


Survey/Survey Notes __________Box 294-30 ____(not in file)_________________________


Foreign Testimony/Native Testimony/Native Register/Foreign Testimony

 _________________________________________________________


Genealogies ___ Abner Paki ___________________




Father                                             Mother                                           Child(ren)

Kamehameha                                                                                        Kalanihelemaiiluna

Kalanihelemaiiluna                                                                              Kalaniulumoku
                                                                                                               Abner Paki

Kalaniiulumoku                            Kakainalii                                       Kalola (w)
                                                                                                               Kaluaikau (w)
                                                                                                               Kalani/Alapai

Abner Paki                                     Konia                                            Bernice Pauahi

Abner Paki                                     Kakainalii                         step:    Kalola (w)
                                                                                                              Kaluaikau (w)
                                                                                                              Kalani/Alapai

Kaaha                                             Kalola

Luluhiwalani                                  Kalola                                           Kahekili/A. Kahekili

                                                                                         hanai/adopted:
                                                                                              Kapooloku/Abigaila/A. Hanawai 
                                                                                             /Kapapoko/Poomaikelani/
                                                                                             Princess Poomaikelani


Kahekili/A.Kahekili/A. Luluhiwalani   Kahananui            Ioela

Ioela                                                      Kapooloku/Abigaila   Haili (w)

Kaluakini                                               Haili (w)                    Elikapeka (w)
                                                                                               siblings

Joseph Matsugoro/Gora                       Elikapeka                 John
                                                                                               siblings

John Matsugoro/Gora                          Mary Castro               Amelia
                                                                                               siblings

Bernice Pauahi Bishop was the heir and next-of-kin to Ruth Keelikolani.

Kalola was the heir and next-of-kin to Bernice Pauahi Bishop.
  

 
 

King's Mahele (page no.)___Page 154____Abenera/Abner Paki ________________________


Konohiki Assigned:  ___Amelia Gora,  John Gora, Thomas Pickard III, Calvin Hulihee, Roy Nakamura, Moses Napihaa, Gordon Keaulana and others_______________________________________________________

Deputy Konohiki/Assistant Konohiki Assigned: ___________________________________________________________

Billing(s) Sent To/ Name of Occupier and Date:____June 1, 2023 Second Notice___________________________________________________


Seven Day Notices Dated: ____________________________________________________________


Police Report No. Filed (if trespassing notices are filed) ______________ ___________________________________________________

Notice of Eviction Date:
_______________________________________________________________

Notice of Removal of Building Date:  _________________________________ 


Notes, etc.

 ________________________________________________________________

****************

Kamehameha Dynasty Allodial Lands No. 2022- 1028   - Royal Family of Kalola (w) next-of-kin to Bernice Pauahi Bishop Billing, etc.

 Kamehameha Dynasty Allodial Lands:   Ruth Keelikolani, Leleiohoku, Bernice Pauahi Bishop,  Abner Paki, Konia, Kalola,  Mataio Kekuanaoa, Moses Kekuaiwa, David Kamehameha, Lot Kamehameha/Kamehameha V, Alexander Liholiho/Kamehameha IV, Victoria Kamamalu, Paalua, John Kapena, Kalima (w), Akahi (w), Kahekili, Kapooloku/Abigaila/ Princess Poomaikelani, Kuakamauna, Hooleia (w), Kaliimakalii (w), Pea/Peapea, Kalanihelemaiiluna, Kaoleioku, Kanekapolei (w), Kauieaouli/Kamehameha III, King Lunalilo, Charles Kanaina, King Kalakaua, Queen Kapiolani, Queen Liliuokalani,  Grace Kamaikui, Hueu Davis, Kale Davis, Peke Davis, et. als.

                                                                                   
        

                                                       Kamehameha Dynasty Allodial Lands

                                                                 Royal Family of Kalola (w)

                                                         Next-of-Kin to Bernice Pauahi Bishop

                                                        Descendants and Heirs  Allodial Lands

                                                                  c/o P.O. Box 861781

                                                           Wahiawa, Oahu, Hawaii  96786

                                                        e-mail:  hwngensoc.akg@juno.com

 

Kamehameha Dynasty Allodial Lands No. 2022- 1028   - Royal Family of Kalola (w) next-of-kin to Bernice Pauahi Bishop Billing, etc.

Date:  1028/2022

 

To:   YWCA - Young Women's Christian Association  

Subject:  Legal Allodial ownership 

From:   Amelia Gora, Royal Person, Royal Family's Representative, Kingdom of Hawaii

 

Greetings,

 

This is to inform you that our Royal family are the landowners of the following land that you occupy.

 

It has been 5 years and 5 months since we had informed you that we have the Superior/Paramount titles for the land that you have built on.

 

see:  

Kingdom of Hawaii/Hawaiian Kingdom Legal Notice No. 2017-0602 Oppositions to the entity State of Hawaii use of Haleakala, Maui, and Rents are Due; Oppositions remain for Maunakea, Hawaii, and Rents are Due; Oppositions remain for Hoopili, and all of Honouliuli, Ewa, Oahu, and Rents are Due; Oppositions remain for the Rail which is trespassing on Royal Families lands. Toll Fees, Rents are Due. This is Notice/Evidence No. 2017 - June 2 - Expanded Billings for Rents, etc. from Amelia Gora, Royal person, Acting Liaison of Foreign Affairs, Royal Famtiily(ies) Trustee (one of), House of Nobles, Konohiki, Judicial Tribunal, Hawaiian Genealogical Society Representative, Konohiki Representative for Kamaikaaloa - Kula, Maui -Haleakala Konohiki; Assistant Minister of Interior affecting Maunakea - Hawaii; One of the five (5) Konohiki of Honouliuli - including Hoopili, Ewa, Oahu; Konohiki of Waimalu, Halawa, Kapalama, Downtown Honolulu - includes Iolani Palace and other specific properties owned by Private Property Owner Amelia Gora, et. als., and our Royal Families.

Reminder:
"
 
- Land Commission Award No. - 121 - Abner Paki ("YWCA")
 
     Private Property of Amelia Gora/Royal Families
         Note:  Amelia Gora et. als. are heirs of A. Paki stepfather of Kalola (w), direct descendant of A. Paki's brother Kalaniulumoku.  A. Paki married Kalaniulumoku's widow named Kaikainalii.  Also descendant of Kahanawai/A. Kahanawai who was the hanai/adopted daughter of Kaikainalii."
 
Update:  Queen Liliuokalani died in 1917 and our family continue to own the Allodial land under Abner Paki.
 
 
Timeline
 
1893 - Invasion of Hawaii by the U.S. and who supported the "White Annexationists" including Charles Reed Bishop.
 
1909 - A Fraud Trust was created which was denied by Queen Liliuokalani who said that she did not sign a Trust Deed with Archibald Cleghorn, William O. Smith, et. als.
 
1915 - Charles Reed Bishop died.
 
1917 - Queen Liliuokalani died.
 
1924 - " The site for it was a portion of the Laniakea Tract from the Allen Estate on Richards Street, which the YW purchased in 1924 for $238,566."
 
Background:
 
"YWCA O'ahu formed in 1900 and was housed in several buildings through 1926. Fundraising for the new building began in February 1925. A ten-day campaign was scheduled with the aim of raising $350,000. Their goal was met in a week with $1,350 to spare.
Location: 1040 Richards St., Honolulu, Hawaii, ...
Architect: Julia Morgan
Built: 1927

YWCA Building (Honolulu, Hawaii) - Wikipedia

DISCUSSION
Abner Paki's land or "The property" use was for only 30 years, which means that the time ran out.  Purchase was made in 1924 from the Allen Estates", a name which is unknown to our family.
The end date for Fee Simple or 30 years only, terminated in 1954.
-  

Aliens have only 30 years to stay due to fee simple/rent/lease/freehold/less than Allodial title.

 

Aliens can never own Allodial or forever titles.

 

Allodial titles were given to only kanaka maoli since December 1849, and "confirmed by the Act of the 6th of August last, and the Act of the 10th of July, 1850, allowing to aliens to acquire and convey lands in fee simple..."

 

Kalola's Family Interest

 

Because Kalola was the next-of-kin to Bernice Pauahi Bishop, she became the owner of all of Abner Paki's et.als. properties since 1884.

 

In 1893, Charles Reed Bishop helped to conspire against Queen Liliuokalani the Royal Family and the people.

 

Charles Reed Bishop lost all interest in lands in the Hawaiian Islands..

 

Therefore, the YWCA owes back rents/leases because no payments were received by our Royal Family to date.

 

DATES:  1924 to 2022 for the amounts of $50,000 per acre per month retroactive to 1924 is due our Royal Family and owed to date.

 

Calculations:  98 years x 12 months = 1,176 months

 

Amounts due:  $37,500 x 1,176 months = $44,100,000 or Forty Four Million, One  Hundred Thousand Dollars.

 

Location1040 Richards St., Honolulu, Hawaii, USA
Coordinateshttps://upload.wikimedia.org/wikipedia/commons/thumb/5/55/WMA_button2b.png/17px-WMA_button2b.png" title="Show location on an interactive map" alt=""/>21°18′38″N 157°51′39″WCoordinates: https://upload.wikimedia.org/wikipedia/commons/thumb/5/55/WMA_button2b.png/17px-WMA_button2b.png" title="Show location on an interactive map" alt=""/>21°18′38″N 157°51′39″W
Built1927
ArchitectJulia Morgan
Architectural styleBeaux-Arts Mediterranean Revival
Part ofHawaii Capital Historic District
NRHP reference No.78001020
Added to NRHP1 December 1978[1]

Reference:  https://en.wikipedia.org/wiki/YWCA_Building_(Honolulu,_Hawaii)#:~:t...

 

 

Allodial Land Owners /  Royal Family Members

 Ruth Keelikolani, Leleiohoku, Bernice Pauahi Bishop,  Abner Paki, Konia, Kalola,  Mataio Kekuanaoa, Moses Kekuaiwa, David Kamehameha, Lot Kamehameha/Kamehameha V, Alexander Liholiho/Kamehameha IV, Victoria Kamamalu, Paalua, John Kapena, Kalima (w), Akahi (w), Kahekili, Kapooloku/Abigaila/Princess Poomaikelani, Kuakamauna, Hooleia (w), Kaliimakalii (w), Pea/Peapea, Kalanihelemaiiluna, Kaoleioku, Kanekapolei (w), Kauieaouli/Kamehameha III, King Lunalilo, Charles Kanaina, King Kalakaua, Queen Kapiolani, Queen Liliuokalani,  Grace Kamaikui, Hueu Davis, Kale Davis, Peke Davis, et. als.

 
 
 
Allodial Land Owner Name  __Abner Paki _________

 

Allodial Land Owner Descendant Heir/Successor__________Amelia Gora - also one of our Royal Family's Representatives__________

 

Location _1040 Richards Street _____Hawaiian Island ____Oahu____ _  

 

Royal Patent/Grant Number _300_ __In our Records__________
 
Land Commission Award Number ___121__ ____________
(for Royal Patent only)
 
Survey/Survey Notes ____________________________
 
Foreign Testimony/Native Testimony/Native Register/Foreign Testimony __________________
 
Genealogies __________Abner Paki daughter Bernice Pauahi Bishop and Next-of-Kin:  Kalola __ 
 
Konohiki Assigned:  ______several____________________________________________________
 
Deputy Konohiki/Assistant Konohiki Assigned: _______several______________________________
 
Seven Day Notices Filed: _________--______________________________________________
 
Police Report No. Filed (if trespassing notices are filed) _______________________________
 
 
Note:  The Liliuokalani Trust created in 1909 are not the Allodial Title landowners.
 
 
Other:  ___The Bernice Pauahi Bishop Estates Trustees/ Kamehameha Schools Bishop Estates/KSBE/ are Not the landowners.  Our Family are the true landowners, the Allodial Title landowners because we are the next-of-kin to Bernice Pauahi Bishop.
Her husband Charles Reed Bishop inherited a life interest only; Kalola inherited the other half until his death, then Kalola became the owner of the entire Estate and owner or the Allodial Land Titles.
 
Kalola also inherited the Ruth Keelikolani Palace, 353,000+ acres, the artifacts of the Kamehameha's, along with all the other Allodial lands that Bernice Pauahi Bishop inherited.
 
Because Charles Reed Bishop participated in usurping Queen Liliuokalani in 1893, Bishop lost all of his life interest in 1893.
 
Kalola the documented next-of-kin and her descendants and successors became the Allodial landowners of the entire estate of Bernice Pauahi Bishop.
 
The Kamehameha School for Boys assisted Charles Reed Bishop and were part of the Annexationists documented.  (see below:  Charles Reed Bishop listed on the Provisional Government participants, and the article "White Annexationists" showing the Kamehameha School Boys participants in the usurpation of Queen Liliuokalani in 1893.)
 
 
Our Royal Family are also Kamehameha descendants who descends from Abner Paki's brother named Kalaniulumoku.  
 
Abner Paki became the husband of his brother's wife named Kakainaalii in 1838.
 
Abner Paki died in 1855.
 
Abner Paki's daughter Bernice Pauahi Bishop died in 1884.
 
Abner Paki's stepdaughter Kalola died in 1886 and left her descendants/heirs and successors. 
 
 
Furthermore, our Private Properties has only a Fee Simple title to Aliens which ended after 30 years.  For example, From 1884 only 30 years could be held by Aliens.  The term of Lease/Fee Simple/Freehold/ Less than Allodial titles ended  in  1914.
 
Therefore, this Royal Patent and all of the lands in Waialae Iki and listed above belongs to Kalola's Family.
 
All homes being sold in Waialae Iki and listed above are now reserved for Kalola's Family, the true Allodial Title landowners.
 
Illegal contracts were made by Charles Reed Bishop and Friends.  They were Not the Allodial ;Title landowners and collected rents/leases/freehold costs and perpetuated wrongs, were in collusion, participated in conspiracies and are not the owners, are not part of our Royal Family's descendants of Kalola, the next-of-kin to Bernice Pauahi Bishop.
 
Note:  Lease negotiations may be made between parties and our Royal Family - Kamehameha Dynasty Allodial Landowners who are not part of the documented conspirators, pirates operating as the Trustees of the Bernice Pauahi Bishop Estates/ KSBE created by treasonous person Charles Reed Bishop and Friends.
 
All persons paying rents, leases to the Trustees of the Bernice Pauahi Bishop Estates are Aliens and are Not associated with our Royal Family who are the descendants of Kalola who is the documented next-of-kin to Bernice Pauahi Bishop.
 
Monies paid out by those selling their Waialae Iki homes, etc. must be obtained from the Trustees of the Bernice Pauahi Bishop Estates who have wrongfully assumed leases/rents/freehold/less than Allodial titles conveyed as illegal contracts to purchasers who were unaware of the status of our lands.
 
Questions?  Contact the Trustees of the Allen Estate,  Estate of Bernice Pauahi Bishop etc.
 
Our Royal Family owns the Allodial Title, the Superior, Paramount Title.
 
This is our ancestors property, Private Property which is our inheritance.  The law documents that no one can take our lands away, etc.
See:  Kekiekie vs. Dennis, HAWAIIAN REPORTS, Supreme Court Law Library/ Archives/ Main Library, Honolulu, Oahu, Hawaii, etc.
 
By law, we can move onto our property at our pleasure which will be soon.
See:  Ioane Piikoi vs. Ioane Kapena case, HAWAIIAN REPORTS, Supreme Court Law Library/ Archives/ Main Library, Honolulu, Oahu, Hawaii, etc. 
 
It is expected that you vacate the premises immediately so that we can use the area for offices, our konohiki use, etc.
 
Otherwise, contact our Royal Family to negotiate a payment plan for past rents due or discuss the immediate removal of your building, etc.
 
All contracts obtained by the Trustees operating as the Bernice Pauahi Bishop Estates/KSBE/ etc. is an illegal entity which was adjudicated as a pirate organization by the Kingdom of Hawaii Supreme Court/ Superior Court.  The same for the 1909 Liliuokalani Trust which she denied signing.  
 
See    References:
http://hawaiiankingdomnews.blogspot.com/2016/03/special-edition-fri...
Updated Supreme Court Cases to Date 1 - 42

                              Hawaiian Kingdom Supreme Court Cases 

                                                    

The following are the Supreme Court Cases Heard and Adjudicated Guilty of Conspiracy(ies), Piracy, Racketeering, etc.:

Case 1.  Liliuokalani Trust of 1909 and the Bernice Pauahi Bishop Estates/KSBE/Kamehameha Schools - Bishop Estates/ Kamehameha Schools Guilty of Fraud, Conspiracy, Piracy, etc.  Posted at https://maoliworld.com/forum/topics/public-notice-billings-being-pr...  and

Judicial Tribunal Listed as Guilty - Maoliworld

https://maoliworld.com › forum › topics › showLastReply
Nov 1, 2021 — Aug 17, 2019 · Hawaiian Kingdom/Kingdom of
 Hawaii No. 2019 - 0816 - Supreme Court Cases 1 thru posted by Amelia Gora, a Royal person, ...
___________________________________________________________________
 
Please respond by email to hwngensoc.akg@juno.com or mail at P.O. Box 861781,
Wahiawa, Oahu, Hawaii  96786
 
Thank you, your cooperation will be greatly appreciated.
 
aloha.
References:
 
 
Evidence:
 
Afft./Lien No. 96-177455 filed on 12/17/96 (281 pages) filed at the Bureau of Conveyances, Honolulu, Oahu, Hawaii and Joinder filed showing the next-of-kin Kalola - Bernice Pauahi Bishop's heir and family, etc.
 
 
 


  

 

 

 
Next-of-kin to Bernice Pauahi Bishop:  Kalola (w)

 

   
Next-of-kin to Ruth Keelikolani:  Bernice Pauahi Bishop

 

 

 

 
Kahekili married Kahananui (female) and had son Ioela (and adopted son:  William Linekona Hokuloa/Charles Williams/Charles Kauweloa) who married Abigaila/Kapooloku/Kapoolohu/ Kapoholoku/ Poomaikelani/ Princess Poomaikelani and had Haili (and siblings/stepsiblings, hanai/adopted) who married Kaluakini and had Elikapeka Kaimiola Kaluakini who married Joseph Gora/ Matsugoro and had John Gora (siblings:  Joseph, William, Walter, Lawrence, Jolly, and Francis) who married Mary Castro and had Amelia Gora (siblings:  Leola, Elizabeth, John, Walter, Kathleen, Marian (dec.) and hanai/adopted Ceferino III/Willy).

Kahananui (female) (siblings:  Kalaikini (female), Ulunui (female), and Isaia) was the daughter of Kuheleloa who was the son of Kauhi.  Kauhi was the son of Kailio and Kaawa (female) and his siblings were:  Kailio 2, Kalama (female), and Paele.  Kailio was the second oldest son of Hueu Davis (siblings:  Kale Davis, and Peke Davis) who was the son of Isaac Davis and Kalukuna/Grace Kamaikui.  Kailio (siblings:  Kahiamoe, and Holokualani) was the grandson of John Young.  Hueu Davis, Kale Davis, and Peke Davis were the hanai/adopted children of John Young, Kamehameha, and Kamehameha III - Kauikeaouli.

 Kahananui (female) married Charles Kuikahi Kawelo/Kauweloa and adopted William Linekona Hokuloa/ Charles Williams/Charles Kauweloa who married Mele Keawe/Keawepoo and had Mary Kauweloa (siblings:  Charles Jr., and Annie) who married Albert Castro and had Mary Castro (siblings:  Harriet, Alberta, John, Albert, Rudolph, Irene, and Joseph), divorced then married Ceferino Maduli (stepsiblings:  Vale, Lucia, Ceferino Jr., Fermina, Francis, and Celestino/Kata).  
 
Mary Castro married John Gora and had Amelia Gora (siblings:  Leola, Elizabeth, John, Walter, Kathleen, Marian (dec.), and hanai/adopted Ceferino III/Willy

Abigaila/Kapooloku/Kapoolohu/ Kapoholoku/ Poomaikelani/ Princess Poomaikelani was the daughter of Kuhio and Kinoiki (female).  Her siblings were Kapiolani/ Queen Kapiolani, Kinoiki 2 (female), and Kapali/Kapaliaweloa.  Their father was Kaumualii of Kauai.  His children were:  Kealiiahonui, Aaron; Humehume/George Humehume; Kinoiki (female); Kahinu (female); Haupu/Kahekili; Kuheleaumoku; Kahai; Kanekoa; and Kaulia.  His stepchildren were all of Kalaniopuu's, Kamehameha's children, stepchildren, and hanai/adopted children.

Abigaila/Kapooloku/Kapoolohu/ Kapoholoku/ Poomaikelani/ Princess Poomaikelani was a hanai of Luluhiwalani and Kalola, the parents of Kahekili (see newspaper article for his ancestry).

Abigaila/Kapooloku/Kapoolohu/ Kapoholoku/ Poomaikelani/ Princess Poomaikelani  was a hanai of Kakainalii (female) who married Kalaniulumoku, Abner Paki, and Kealoha.

Abigaila/Kapooloku/Kapoolohu/ Kapoholoku/ Poomaikelani/ Princess Poomaikelani  was a hanai of Kaunuohua (female).

Abigaila/Kapooloku/Kapoolohu/ Kapoholoku/ Poomaikelani/ Princess Poomaikelani  was also a daughter/hanai of Kaeha/Kamakaeha/Makaeha/Lydia/Liliuokalani/ Queen Liliuokalani.

Abigaila/Kapooloku/Kapoolohu/ Kapoholoku/ Poomaikelani/ Princess Poomaikelani's sister Queen Kapiolani was the hanai/adopted daughter of Kaluakini.  Kaluakini later married Abigaila/Kapooloku/Kapoolohu/ Kapoholoku/ Poomaikelani/ Princess Poomaikelani 's daughter Haili who had Elikapeka Kaluakini(siblings) who married Joseph Gora/Matsugoro and had John Gora (siblings) who married Mary Castro and had Amelia Gora (siblings).

There are many other family lines which is not listed here.  
 
References:
 
 
 
 

The following is additional evidence of Treason, Conspiracy by Charles Reed Bishop & Friends/Partners in Crime/Conspirators/Pirates/Pillagers/Terrorists:

The Pacific commercial advertiser. [volume] (Honolulu, Hawaiian Islands) 1885-1921, June 23, 1893, Image 6

Image provided by University of Hawaii at Manoa; Honolulu, HI

Persistent link: https://chroniclingamerica.loc.gov/lccn/sn85047084/1893-06-23/ed-1/...

Print this image | Download this image

https://chroniclingamerica.loc.gov/iiif/2/hihouml_caliban_ver02%2Fdata%2Fsn85047084%2F00202195714%2F1893062301%2F0277.jp2/673,834,2549,2428/681,648/0/default.jpg"/>

The Pacific commercial advertiser. [volume] (Honolulu, Hawaiian Islands) 1885-1921, June 23, 1893, Image 6

Image provided by University of Hawaii at Manoa; Honolulu, HI

Persistent link: https://chroniclingamerica.loc.gov/lccn/sn85047084/1893-06-23/ed-1/...

Print this image | Download this image

https://chroniclingamerica.loc.gov/iiif/2/hihouml_caliban_ver02%2Fdata%2Fsn85047084%2F00202195714%2F1893062301%2F0277.jp2/656,3162,2549,2428/681,648/0/default.jpg"/>

The Pacific commercial advertiser. [volume] (Honolulu, Hawaiian Islands) 1885-1921, June 23, 1893, Image 6

Image provided by University of Hawaii at Manoa; Honolulu, HI

Persistent link: https://chroniclingamerica.loc.gov/lccn/sn85047084/1893-06-23/ed-1/...

Print this image | Download this image

https://chroniclingamerica.loc.gov/iiif/2/hihouml_caliban_ver02%2Fdata%2Fsn85047084%2F00202195714%2F1893062301%2F0277.jp2/641,5528,2549,2428/681,648/0/default.jpg"/>

The Pacific commercial advertiser. [volume] (Honolulu, Hawaiian Islands) 1885-1921, June 23, 1893, Image 6

Image provided by University of Hawaii at Manoa; Honolulu, HI

Persistent link: https://chroniclingamerica.loc.gov/lccn/sn85047084/1893-06-23/ed-1/...

Print this image | Download this image

https://chroniclingamerica.loc.gov/iiif/2/hihouml_caliban_ver02%2Fdata%2Fsn85047084%2F00202195714%2F1893062301%2F0277.jp2/664,7976,2549,2428/681,648/0/default.jpg"/>

The above lists all who conspired against Queen Liliuokalani in 1893.

The most evil is Charles Reed Bishop who arrived in Hawaii with William Lee.  Both worked for the American Consulate, then as an attorney, plantation owner, banker, etc.

Bishop was a "gold digger" marrying Bernice Pauahi Bishop who was Not the "last of the Kamehameha's".

 
 
"White Annexationists" article which shows Kamehameha Boy Schools were participants in usurping Queen Liliuokalani in 1893

The following article shows the "white race" in the Annexation count in 1893.  

Both the Kamehameha School and Punahou School boys were taken in the count:

The Daily bulletin. [volume] (Honolulu [Hawaii]) 1882-1895, May 08, 1893, Image 2

Image provided by University of Hawaii at Manoa; Honolulu, HI

Persistent link: https://chroniclingamerica.loc.gov/lccn/sn82016412/1893-05-08/ed-1/...

Print this image | Download this image

https://chroniclingamerica.loc.gov/iiif/2/hihouml_gold_ver01%2Fdata%2Fsn82016412%2F00294552182%2F1893050801%2F0530.jp2/907,3848,859,818/681,647/0/default.jpg"/>

The Daily bulletin. [volume] (Honolulu [Hawaii]) 1882-1895, May 08, 1893, Image 2

Image provided by University of Hawaii at Manoa; Honolulu, HI

Persistent link: https://chroniclingamerica.loc.gov/lccn/sn82016412/1893-05-08/ed-1/...

Print this image | Download this image

https://chroniclingamerica.loc.gov/iiif/2/hihouml_gold_ver01%2Fdata%2Fsn82016412%2F00294552182%2F1893050801%2F0530.jp2/919,4655,859,818/681,647/0/default.jpg"/>

The Daily bulletin. [volume] (Honolulu [Hawaii]) 1882-1895, May 08, 1893, Image 2

Image provided by University of Hawaii at Manoa; Honolulu, HI

Persistent link: https://chroniclingamerica.loc.gov/lccn/sn82016412/1893-05-08/ed-1/...

Print this image | Download this image

https://chroniclingamerica.loc.gov/iiif/2/hihouml_gold_ver01%2Fdata%2Fsn82016412%2F00294552182%2F1893050801%2F0530.jp2/945,5471,859,818/681,647/0/default.jpg"/>

The Daily bulletin. [volume] (Honolulu [Hawaii]) 1882-1895, May 08, 1893, Image 2

Image provided by University of Hawaii at Manoa; Honolulu, HI

Persistent link: https://chroniclingamerica.loc.gov/lccn/sn82016412/1893-05-08/ed-1/...

Print this image | Download this image

https://chroniclingamerica.loc.gov/iiif/2/hihouml_gold_ver01%2Fdata%2Fsn82016412%2F00294552182%2F1893050801%2F0530.jp2/957,6275,859,818/681,647/0/default.jpg"/>

SUMMARY

With the inclusion of Kamehameha Schools as part of the annexationists counts, this verifies the fact that the Kamehameha Schools was made for the purposes of adding supporters for the White Supremacist Charles Reed Bishop who was the "backbone" of the treasonous persons who helped to usurp Queen Liliuokalani in 1893.

It can be said that since 1893, Kamehameha Schools and Punahou Schools were the financed bodies of  the White Supremacists whose purposes was to support the usurpation of Queen Liliuokalani, and utilized funds rightfully belonging to Queen Liliuokalani and the Royal Family.

Queen Liliuokalani was the hanai/adopted sister of Bernice Pauahi Bishop whose husband and friends orchestrated the theft of Hawaiian monies by organizing a "Trust" which criminally assumed lands of the Kamehameha's for their purposes leading up to the criminal assumption of lands, monies, etc. belonging to the Royal Family.

Therefore, it can be said that the Kamehameha Schools was a reason for the criminal pirates, pillagers, racketeers, a planned diversion to appear as if the education reason was for the children when it was really a scoundrel activity hiding the fact that the Bernice Pauahi Bishop Estates Trustees of 1884 were the true thieves, scoundrels, who helped to plan the usurpation of the Queen in 1893, and form a fraudulent trust in 1909 to assume all.

It is true what Judge Stuart observed:

Judge Stuart exposed the Corruptions in the Hawaiian Islands, in the claimed governments, and the courts, etc.............He complained about the usurpers to his President Wilson..............Wilson destroyed his letters by cutting it up and giving parts to those who were being written about.

Wilson threw his parts into the trash can.

Interesting man Judge Stuart....he bluntly admitted that the Bishop Estates was set up for the "real purposes of taking care of the trustees and hangers-on..."

Lastly, Charles Reed Bishop died in 1915.  He left monies to many including Kamehameha Schools, and Punahou Schools.

Most of the monies was not his.  He lost all interest in the Kamehameha's monies in 1893 due to his collusion, treasonous activities. 

 

If that were not the case he would have lost all interest in1915 when he died and had only a life interest.

Rents are due from the Trustees of both trusts for lands criminally claimed by an illegal, criminal, pirate, pillaging, racketeering trust which owns nothing because they are not the allodial land owners, genocide activist, treasonous persons who have all breached the neutrality laws as well.

Reference:  

http://amelia-gora.blogspot.com/2017/12/judge-stuart-exposes-bishop...

https://maoliworld.com/forum/topics/the-legitimate-government-in-ha...

Nation to Nation Legal Directive/Notice to All No. 2022-0919 Cause for Investigations: Piracy/Corruption in Hawaii Affecting the U.S., State of Hawaii, Bankers, Wall Street etc. from Amelia Gora, a Royal Person, Acting Liaison of Foreign Affairs, etc. - Kingdom of Hawaii

 

Kingdom of Hawaii/Hawaiian Kingdom Legal Notice No. 2017-0602 Oppositions to the entity State of Hawaii use of Haleakala, Maui, and Rents are Due; Oppositions remain for Maunakea, Hawaii, and Rents are Due; Oppositions remain for Hoopili, and all of Honouliuli, Ewa, Oahu, and Rents are Due; Oppositions remain for the Rail which is trespassing on Royal Families lands. Toll Fees, Rents are Due. This is Notice/Evidence No. 2017 - June 2 - Expanded Billings for Rents, etc. from Amelia Gora, Royal person, Acting Liaison of Foreign Affairs, Royal Famtiily(ies) Trustee (one of), House of Nobles, Konohiki, Judicial Tribunal, Hawaiian Genealogical Society Representative, Konohiki Representative for Kamaikaaloa - Kula, Maui -Haleakala Konohiki; Assistant Minister of Interior affecting Maunakea - Hawaii; One of the five (5) Konohiki of Honouliuli - including Hoopili, Ewa, Oahu; Konohiki of Waimalu, Halawa, Kapalama, Downtown Honolulu - includes Iolani Palace and other specific properties owned by Private Property Owner Amelia Gora, et. als., and our Royal Families.



Posted by at 2:52 AM
********************************************************
HONOLULU POLICE DEPARTMENT
TRESSPASS/ SQUATTER STATUS OF THE YWCA, 1040 Richards Street, Honolulu, Hawaii  96813:
Report posted:

 DISCONNECT NOTICES: FOR ELECTRICITY AND WATER:

Land owner disconnect Notice for the YWCA -1040 Richards Street

Inbox

Amy Gora goraamy69@gmail.com

9:17 AM (20 minutes ago)
to connect, nfo, info, bcc: me
Greetings,

As one of the land owners and Representatives of our Royal Family, I am requesting the shutdown of the electricity for the building effective immediately.

The YWCA has failed to pay for the use of our land.

The address is:
                               1040 Richards Street
                               Honolulu, Hawaii  96813

Thank you,

Amelia Gora - one of Kamehameha's descendants, heir of Abner Paki who is documented as the owner of the land, Acting Liaison of Foreign Affairs - Kingdom of Hawaii

 Land owner disconnect Notice for the YWCA -1040 Richards Street

Amy Gora goraamy69@gmail.com

9:32 AM (0 minutes ago)
to contactus, customerservice, info

Land owner disconnect Notice for the YWCA -1040 Richards Street

 
 
Greetings,

As one of the land owners and Representatives of our Royal Family, I am requesting the shutdown of the water for the building effective immediately.

The YWCA has failed to pay for the use of our land.

The address is:
                               1040 Richards Street
                               Honolulu, Hawaii  96813

Thank you,

Amelia Gora - one of Kamehameha's descendants, heir of Abner Paki who is documented as the owner of the land, Acting Liaison of Foreign Affairs - Kingdom of Hawaii

 YWCA - 1040 Richards Street, Honolulu, Oahu, Hawaii - EVICTION & SQUATTER STATUS

Amy Gora goraamy69@gmail.com

10:11 AM (5 minutes ago)
to Office, hpd, info, 
                                
unnamed (1).png

Greetings,

The YWCA has been served a number of notices and have failed to pay rents of $50,000 per month retroactive (see link:  https://iolani-theroyal.blogspot.com/2024/03/updated-legal-advisorynotice-no-2024.html )

Please document this information because they are on our Royal Family's Private Property.

According to law, no one can take, confiscate, our Private Property.

Also, please document this with the Genocide Activities File Number that I was assigned to in 1998.

They have failed to pay rents, including retroactive rents, and their status is squatters, no different status from the homeless, houselee, street people.

Under the rule of law, we have the right to have the YWCA knock down the building at their expense or for them to vacate the premises immediately.

Our Royal Family has the Allodial land title.


Thank you,

Amelia Gora, one of Kamehameha's descendants, and descendant of Kalola, the next-of-kin to Bernice Pauahi Bishop, Acting Liaison of Foreign Affairs - Kingdom of Hawaii.